大理石电梯门套施工流程及步骤

2017-08-08 16:13:30 文章来源:www.jnhaohui.com

大理石电梯门套施工流程:基层墙面处理→墙面钻孔踢槽→放镀锌铅丝或铜丝→钢丝网连接→拼装→打线→大理石板材安装固定→灌浆→清缝→整体清洁→全面综合检查→验收
Elevator door marble construction process: the wall treatment, wall drilling play groove to put galvanized lead wire or copper wire, wire mesh, wire connection, assembly, installation, grouting, marble plate fixed joint, overall clean, comprehensive inspection and acceptance
大理石电梯门套施工步骤:
Marble elevator door construction steps:
1、石材挑选:用比色法对石材的颜色进行挑选分类,安装在同一面的石材颜色应一致,按设计图纸及分块顺序将石材编号。
1, stone selection: using the color of the stone to choose, classification, installation in the same side of the stone color should be consistent, according to the design drawings and block order stone number.

电梯门套
2、墙面基层清理:清理墙面,装好基层托架。同时进行结构套方,找规矩,弹出垂直线和水平线。并根据设计图纸和实际需要弹出安装石材的位置线和分块线。
2, metope base clean up: clean the wall, install the base bracket. At the same time, the structure of the sleeve side, to find the rules, pop-up vertical and horizontal lines. And according to the design drawings and actual needs, pop-up installation of stone location, line and block line.
3、打线:根据尺寸,打好施工线,石材安装前要事先用经纬仪打击大角两个面的竖向控制线,最好弹在离大角500px 的位置上,以便随时检查垂直挂线的准确线,保证顺利安装,并在控制线的上下作出标记。
3, line: according to the size, good construction line, stone installation before prior to the theodolite two vertical strike bighorn control line, the best bomb in the 500px position from the angle, in order to check the accuracy of the vertical line hanging line at any time, to ensure the smooth installation, and in control of the next line marking.
4、安装底层托架,把预先安排好的支托按上平线支在将要安装的底层石板上面。支托要支承牢固,相互之间要连接好,也可和架子接在一起,支架安好后,顺支托方向钉铺通长的50mm 厚木板,木板上口要在同一个水平面上,以保证石材上下面处在同一水平面上。
4. Install the bottom bracket, and place the prearranged support on the top bottom line on the bottom stone board to be installed. Support to support each other to firmly connected, and can also be connected with the support shelf, well, along the supporting nail 50mm plank paved direction length, upper board to be at the same level, to ensure that the stone below to be on the same plane.
5、安装连接构件:用设计规定的不锈钢螺栓固定角钢和平钢板。调整平钢板的位置,使平钢板的小孔正好与石板的插入孔对上,固定平钢板,用扳子拧紧。
5. Installation of connection components: the design of the provisions of the stainless steel bolts fixed angle steel and peace plate. Adjust the flat plate position, so that the flat plate hole coincides with the insertion hole on the stone, fixed flat plate, with screw wrench.
6、大理石装饰板材安装:按照沟槽和构件找好位置,便可把底层面板靠角上的一块就位。
6 marble decorative plate installation: in accordance with the groove and components to find a good location, you can put the bottom panel on the corner of a block.