电梯门套做法的要点
电梯门套做法的要点:
The main points of the elevator door cover is:
1、物料准备:线条、泡棉胶、硅酮胶、切割锯、胶枪、红外线仪器。
1, material preparation: line, foam rubber, silicone rubber, cutting saw, glue guns, infrared instruments.
2、结构墙体基面清理干净表面没有油污、浮尘、并检验墙面平整度和垂直度。超差部分应剔凿或用水泥砂浆修补缺陷,加固找平,方能施工。
2, the structure wall base clean surface oil pollution, dust, and no inspection wall roughness and verticality. Out-of-tolerance part should be picked chisel or to repair the defect with cement mortar, reinforcement leveling, can the construction.
3、在墙面找出水平线、垂直控制线。
3, find out the horizontal line, perpendicular line in metope.
4、切割锯采用45度角对线条切割并对角拼接检查平整度。
4, with 45 degree Angle to the line cutting cutting saws and diagonal stitching inspection flatness.
5、线条背面点粘硅酮胶。
5, lines on the back of the silicone rubber.
6、将线条安装到位,压实,并用夹具国定。
6, the line is installed, compaction, and fixture national.
7、将对角处缝隙打玻璃胶填满抹平。
7, the diagonal cracks fill screeding play glass glue.
8、将线条与墙的间隙打胶抹平。
The clearance between the wall and 8, the line with glue.
9、整体完工电梯门套。
9, the overall completion elevator door cover.