电梯门套的房门部分施工方法:
The door part of the construction method of elevator door:

1、空心门做法:门扇厚度为43-45mm。用12mm夹板开条,四周立放2-3圈,加固横条间距不能超过200mm,装锁位置不能留空,合页位必须加固,两面封5mm夹板,再封饰面。
1, hollow door door leaf thickness 43-45mm approach. 12mm plywood for open, around vertical circle 2-3, reinforcement bar spacing of not more than 200mm, to hold the lock location cannot be blank, a hinge must be strengthened, both sides seal 5mm splint, and then seal finishes.
2、实心门做法:门扇厚度为43-45mm的,用进口夹板平压,夹板双面开出对称的平衡缝,夹板间用白乳胶有用枪钉固牢,如果需要粉刷大面积墙面,建议使用不锈钢电梯装饰板。空心门放于标准的压床平压4天以上,不锈钢电梯门套施工每道工序都必须涂上白乳胶;实心门做好后必须再贴面板,放于标准床平压4天以上。
2, the solid door practices: door leaf thickness 43-45mm, pressed plywood imports, splint double-sided opened symmetrical balance seam, splints with white latex useful gun nail fastened, if need to paint the wall in a large area, it is recommended the use of stainless steel decorative plate for lift. Hollow door put in standard press flat pressure for more than 4 days, stainless steel elevator door construction each process must coat with white latex; good solid doors must stick panel again, put to the standard flat bed press for more than 4 days.
本文由电梯门套友情奉献。更多有关的知识请点击:http://www.jnhaohui.com>最真诚的态度。为您提供最为全面的服务。更多有关的知识我们将会陆续向大家奉献。敬请期待。
This article is contributed by the elevator door friendship. More knowledge about please click: attitude of http://www.jnhaohui.com most sincere. For you to provide the most comprehensive services. More relevant knowledge and we will continue to everyone dedication. Stay tuned.